Schedule Gantt in Aire

A project schedule lives in the model as schedule blocks: each activity has a start, a duration in days, and the activities it waits on. The Schedule Gantt draws that schedule as a chart, so the same terms that drive your financial model also show you when things happen.
  • Every schedule block with a start and a duration becomes a bar
  • Sections roll their activities up into one bar
  • The critical path is marked, and a lag between linked activities moves it
  • Edit an activity on the chart and the model updates

Starting a schedule

Choose Add schedule block and start from one of nine reviewed templates, or from an empty block:
  • Solar, at concept stage or in development
  • Battery storage: utility scale, commercial and industrial, behind the meter, or front of the meter at concept stage
  • Solar with battery storage, at concept stage
  • Industrial, at concept stage or in development
A template brings its activities, their typical durations, and the links between them. Change any of them once it is in your model.

Schedule metrics and sensitivity

Schedule metrics are the durations and dates a sensitivity study can read, such as the number of days to a milestone. Add them to a schedule and they appear as outputs in Sensitivity Analysis. Put a Monte Carlo distribution on any activity’s duration to see how the finish date moves, with the activity’s name on the axis.

Aire AI

Ask Aire AI to build a schedule and it starts from a template, adds the schedule block, edits activities, and adds the schedule metrics a study reads. It works on the scenario you have open in the Gantt.